DONG GUAN WKK MACHINERY CO., LTD. \n \n东莞王氏港建机械有限公司
Multiline PE punch installation & Quality Survey
冲孔机安装和品质调查
(Version 1.0)
Installation Basic Information / 安装基本信息
1.
Record of the damage / 破损记录
(
发
现包装箱损坏应尽快通知有关同事以及保险公司或公证人,并拍照保存证据/ If damaged packaging is found, promptly notify relevant colleagues, the insurance company or notary public, and take photos to preserve evidence.)
否 / No
是 / Yes
2.
Check whether the outer packaging box is damaged / 包装箱是否有破损
否 / No
是 / Yes
3.
Check whether the sealed inner packageing is damaged / 密封内包装是否破损
否 / No
是 / Yes
4.
Check whether the stock indicator sticker has turned red / 包装箱外震荡检视标贴是否有跳转到红色
否 / No
是 / Yes
5.
Basic Information / 基本信息
Customer Name / 客户名称:
Machine Serial Number / 机器序列号:
Rated Voltage (Label) / 机器铭牌标示电压:
6.
Installation Start Date / 安装开始日期:
7.
Installation Completion Date / 安装完成日期:
General Routine Checks / 常规项目检查
8. Please fill in the measured electrical values. / 请填入测量的数值。
Three-phase input voltage (V) / 三相输入电压(V):L1-L2 /L2-L3/L1-L3
Single-phase AC voltage (V) / 单相电压AC(V):
DC48V voltage (V) / DC48V电压(V):
24V Power Supply Input AC voltage (V) / 24V电源输入电压AC(V):
24V Power Supply Output DC voltage (V) / 24V电源输出电压DC(V):
Input Air Pressure (MPa) / 输入气压(MPa) 检视3分钟,最高气压值 - 最低气压值:
Machine level adjustment confirmation / 机器水平调整确认(要求0 ±0.02 mm/m)
9. System Software Information / 系统软件信息
Windows Operating System / 操作系统:
MultiLine Software Version / MultiLine软件版本:
10. System Software Operation Status / 系统软件运行状态
Normal / 正常
Abnormal / 异常
11. If abnormal, describe the issue and action taken. / 如异常,请描述状况及处理结果。
12. Whether the machine meets the customer‑ordered specification requirements/ 机器是否满足客户订购机器的规格要求
Yes / 是
No / 否
13. If no, please specify the requirements. / 如否,请说明要求。
14. Special issues observed (if any, please fill in the blank)/ 发现特殊情况(如有,请填写)
15. Additional comments or suggestions for improvement. / 其他意见或改进建议。
Automation / Pre-alignment Section / 自动化/预对位部分(适用于ATP ECP机型)
16. Please evaluate the following items. / 请评价以下项目。
Normal / 正常
Abnormal / 异常
N/A / 不适用
Board feeding roller / 进板滚轮
Centering flapper / 分中拍板
Board stop mechanism / 停板机构
Pre-alignment camera / 预对位镜头
Pre-alignment action / 预对位动作
Pre-alignment board transfer / 预对位送板
Automation / Pre-alignment Section / 自动化/预对位部分(适用于CUP机型)
17. Please evaluate the following items. / 请评价以下项目。
Normal / 正常
Abnormal / 异常
N/A / 不适用
Material Loading Device / 进板装置
Material Clipper / 夹板装置
Material Dimension Guiding Device / 板尺寸调整装置
Material Ejector / 脱板装置
18. Comments on automation/pre-alignment abnormalities and actions taken. / 自动化/预对位部分异常及处理结果。
19. Please fill in the hydraulic system pressure and camera/lens details. / 请填入液压系统压力及镜头相关信息。
Hydraulic High Pressure (psi) / 液压高压(psi):
Hydraulic Low Pressure (psi) / 液压低压(psi):
Deceleration Pressure/减速压力
Number of Machine Cameras / 主机镜头数目:
Number of Alignment Nulling / 对位次数:
20. Please evaluate the following main machine components and performance. / 请评价以下主机组件及性能。
Normal / 正常
Abnormal / 异常
Board feeding belt / FORCER / 进出板送板皮带/FORCER
Hydraulic system / 液压系统
Machine cameras / 主机镜头
Alignment action / 对位动作
Die/Punch Pin/ 模具/冲针
Punch selection/mold adjustment mechanism & screws / 冲针选择/调模机械及螺丝
Punching quality / 冲孔品质
21. Please evaluate the following main machine components and performance. / 请评价以下主机组件及性能。
Pass / 合格
Fail / 不及格
Position accuracy / 位置精度
Target vs. punching accuracy / 靶标与冲孔精度
Repeatability accuracy / 重复精度
22. Comments on main machine abnormalities and actions taken. / 主机部分异常及处理结果。
Board Unloading Section / 出板机构(适用于ATP ECP机型)
23. Please evaluate the unloading mechanisms. / 请评价出板机构。
Normal / 正常
Abnormal / 异常
N/A / 不适用
Unloader belt/roller / 出板皮带/滚轮
Unloader control and motor / 出板控制及马达
24. Comments on unloader section abnormalities and actions taken. / 出板机构异常及处理结果。
Miscellaneous and Machine Condition / 杂项和机器状况
25. Environmental parameters / 环境参数
Temperature (℃) / 温度(℃):
Relative Humidity (%) / 相对湿度(%):
26. Virus infection status / 病毒感染状态
No infection / 没有感染
Infected / 有感染
27. If infected, describe action taken. / 如有感染,请描述处理措施。
28. 试产情况 / Trial Production Status
合格 / Pass
不合格 / Fail
29. If failure, describe action taken. / 如有异常,请描述处理措施。
30. Customer training provided
Safety / 安全
Operation / 操作
Maintenance / 保养
MES integration / MES
SPC/SPC采集
31. Free accessories/tools handed over and checked? / 已点算移交赠品工具等?
Yes / 是
No / 否
32. If no, explain reason. / 如否,请说明原因。
33. Machine meets requirements for production handover? / 符合要求交付生产?
Yes / 是
No / 否
34. If no, explain reason. / 如否,请说明原因。
Overall Installation Quality Evaluation / 整体安装质量评价 (1-10分)
35. Rate the following aspects of this installation. / 评价本次安装的以下方面。
1
2
3
4
5
6
7
8
9
10
Basic functionality / 基本功能
Accuracy / 精度
Mechanical design / 机械设计
Software / 软件
Electrical control / 电控
Assembly / 组装
Parts / 零件
After-sales service / 售服
Overall / 整体
36. Agent information / 代理商资料
Company Name / 公司名称
Service Engineer Name / 售后工程师姓名:
关闭
更多问卷
复制此问卷